Pool renovations · before and after
Leaks, worn linings, outdated equipment or high energy use do not always require complete demolition. We assess what still works, intervene where needed and transform the pool with a custom technical and aesthetic solution.
Request a site visit
When renovation makes sense
A site visit distinguishes cosmetic defects from structural or equipment problems and establishes priorities, costs and schedules.
Real projects in Ticino
Drag the slider on the images to compare the result. Scroll sideways to see all projects.


From a deteriorated basin to an in-ground pool with a new structure, PVC lining and natural-stone coping.


Renovated lining and upgraded equipment for a more reliable pool that is easier to maintain.


New dark lining and overflow on three sides to enhance the lake view.


Transforming the old above-ground basin into an integrated pool with stone coping and new PVC lining.


Photo comparison before and after renovation.


Photo comparison before and after renovation.


Photo comparison before and after renovation.
The scrollbar remains visible on desktop; on a smartphone, swipe with your finger.
The Atec Pool approach
We check the pool shell, lining, plant room and causes of the problem.
We compare targeted repairs and complete renovation with transparent costs.
We coordinate selective demolition, equipment, finishes and testing.
Handover, instruction and support for reliable operation.
No. After the site visit, we identify which parts can be retained and which need replacing.
Yes. The result depends on the lining, depth, light and surroundings.
Yes. Filtration, pumps, disinfection, lighting and automation can be renewed together or in stages.
Show us your pool’s current condition: we will prepare a practical, clear assessment.